View for Four Rooms no.1

Videoinstallation with mirror and glass, BEK, 2010.

View for Four Rooms no.1

Videoinstallation with mirror and glass, BEK, 2010.

The Mirror Stage

    Videoinstallation at USF Bryggen, 2009. Work supported by BEK, Khib, BKK, Electro Team AS, Kafé Kippers.   Lamppost: The lightbulb is swopped with power adaptor, mac mini and projector, showing circular video footage on the wooden pier floor beneath.

The Mirror Stage

    Videoinstallation at USF Bryggen, 2009. Work supported by BEK, Khib, BKK, Electro Team AS, Kafé Kippers.   Lamppost: The lightbulb is swopped with power adaptor, mac mini and projector, showing circular video footage on the wooden pier floor beneath.

Ripple

Videoinstallation, Ripple, Oct 2010. Commissioned work for BEK at  Borggården USF.  

Ripple

Videoinstallation, Ripple, Oct 2010. Commissioned work for BEK at  Borggården USF.